尊时凯龙人生就博

Relocations Project of Xitucheng Road Sewage Pipeline at Jimenqiao Station of Beijing Metro Line 12

Projects > Relocations Project of Xitucheng Road Sewage Pipeline at Jimenqiao Station of Beijing Metro Line 12

Relocations Project of Xitucheng Road Sewage Pipeline at Jimenqiao Station of Beijing Metro Line 12

Project Overview

In order to cooperate with the construction of the subway station, the pipeline needs to be permanently relocated to the east side of the current sewage. The 1.6×1.6 single hole digging is 500m in length and the cost is about 10 million yuan.


Initial lining construction


Leading catheter


Earth excavation

Steel arch, mesh
Shotcrete

Waterproof construction


waterproof

waterproof

Secondary lining construction


template


Second lining concrete


Rebar

Rebar
XML地图